Allargue Estate - Colonal Miff Tuck

Highland Eco-design was engaged to carry out the design, construction and installation of a 11kw medium head micro hydro scheme This work included

  • Obtaining all abstraction licence, planning and environmental consents.
  • A new scheme construction using culvert and pressure pipe with a new custom built intake structure and screening arrangement.
  • The design and construction of a new turbine house to meet aesthetic planning conditions within the Cairngorms National Park.
  • The installation of a crossflow turbine with generator and control equipment.
  • grid connection and testing to engineering reccomendation g83/1.

This scheme was connected to the main house and cottage for on-site consumption.

Main parameters: head 20m, flow 100l/sec, energy yield 45,000kwh, output 11kw, co2 saving 23 tons

On behalf of several Clients of Bell Ingram I have worked with Jamie Wallace of Highland Eco Design on a number of Hydro schemes and have always been very pleased with depth of practical knowledge which Jamie brings to any scheme . He has a good working knowledge of the design and construction of the engineering involved and is able to deliver schemes at very competitive cost.

John M Wood
Bell Ingram

Highland Eco Design were involved in every aspect of the design, construction and commissioning of our 27kw Hydro Electric Scheme in South Ayrshire. Since first meeting Jamie Wallace of Highland Eco I felt comfortable with the company's knowledge of the industry and their honesty in explaining the process that the whole project would involve. In all my dealings they have been attentive, straightforward and delivered a system which was well designed and fit for purpose. I was also impressed by the fact that they did not overstate the expected output from the scheme so I am confident that financially the Hydro Electric Scheme will operate as originally promised.

Andrew P Sinclair
Sinclair Scott

Highland Eco-design was engaged to carry out the design, construction and installation of a 11kw medium head micro hydro scheme

Colonal Miff Tuck
Allargue Estate